Full Description
An ideal opportunity to acquire a new build property located in Mojacar.
There are four, three bedroom, two-bathroom apartment with a garage and trastero, located on a community of 22 apartments. The remaining 18 are two- bedroom, two bathroom, see our reference E187 for details of these.
The apartments are located on both the ground and first floor and there are two floor plans available.
Prices start from 250,600€ including the garage and the trastero.
1.The start of the work has yet to be commenced as the constructor is working with the Town Hall regarding the licences
2.The beginning of the work will be scheduled, once 50% of the homes have been purchased. Payment method for clients will be the following:
2.1.-Reservation of €10,000 VAT included.
2.2.-Once 50% of the properties in reserve have been obtained, the promoter financing and start of work will be obtained; Therefore, the purchase-sale contract was signed with the reservist clients, with a delivery of 10% plus VAT.
2.3.-The purchase and sale contract will specify that the rest (20%) up to 30% plus VAT, will be made through direct debits in 4 instalments from the beginning of the work:
- The 1st at 6 months when the structure is finished.
- The 2nd at 10 months when the partition walls are finished.
- The 3rd at 15 months when the cover is finished.
- The 4th when the works are completed.
3.- The expected delivery date will be 24 months once the work has begun.
FOUNDATION AND STRUCTURE
• Foundation, retaining walls and reinforced concrete/mixed structure
calculated according to Seismic-Resistant Construction Standard (NCSE-02).
2. MASONRY AND ROOFING
• Exterior enclosure using a nasturtium made of brick or
concrete block, air chamber, thermo-acoustic insulation and partitions
“Pladur” type laminated plasterboard, in accordance with the Technical Code of the
Edification.
• Division between homes executed according to the technical specifications of the
Technical building Code.
• Interior divisions of homes using laminated plasterboard partitions
“Pladur” type.
• Acoustic insulation according to the Technical Building Code.
• Thermal insulation according to the Technical Building Code.
• Cover composed of slope formation, polymeric asphalt sheet of
4 kg., thermal insulation and protection using geotextile, with aggregate washed in
non-passable roofs and tiled floors on passable roofs, (guarantee 10
years), in accordance with the Technical Building Code.
3. COATINGS, FLOORING AND TILING
• Exterior coating using a monolayer or similar, to be defined by the Management
Optional.
• Interior covering of the home using laminated plaster panels.
“Pladur”.
• House flooring using top quality floating flooring from the brand
Porcelain or similar and white lacquered skirting board, to be defined by the Management
Optional.
• Bathroom flooring using top quality stoneware from the Porcelanosa brand or
similar, to be defined by the Project Management.
• Bathroom tiling with top quality Porcelanosa brand tiles or
similar, to be defined by the Project Management.
• Rest of walls and ceilings painted with smooth paint, colour to be defined by the
Project management.
4. CARPENTRY
• Access door to the home, equipped with security hardware, anchor points and
optical sight.
• White lacquered passage doors. Stainless steel hardware, circular rosette,
waterproof rubber gasket in rebate, 9 cm straight flashing.
• Exterior carpentry in PVC with thermal bridge break, with double
CLIMALIT glazing or similar, with incorporated hooding, shutters
aluminium.
• Motorized blinds in living room.
• Built-in wardrobe in the hallway, with white lacquered front, lined interior
with hanging bar and trunk shelf.
5. PLUMBING
• Embedded interior installation of cross-linked polyethylene pipe or similar, to
defined by the optional management.
• Single-lever taps from the Roca brand or similar, to be defined by Management
Optional.
• Roca or similar brand toilets, to be defined by the Project Management.
• Installation of domestic hot water (ACS) using aerothermal equipment.
low consumption, according to the CTE.
6. ELECTRICITY
• Installation according to Low Voltage Electro-technical Regulations.
• NIESSEN brand mechanisms or similar, to be defined by the Project Management.
• Telecommunications installation according to current regulations.
• Telephone and TV/FM socket in living room, kitchen, bedrooms and terraces.
7. AIR CONDITIONING AND VENTILATION
• Ventilation throughout the home according to the Technical Building Code, with
mechanical extraction in kitchen and bathrooms.
• Pre-installation of air conditioning inside the home through ducts with
grilles in living room and bedrooms.
8. OTHERS
• Bathrooms with sink cabinet.
• LED lights in the home, fully installed.
• Parking for two vehicles in homes 1 to 7.
• Garden on natural terrain and terrace.
9. CLOSED BUDGET PACKS
• Kitchen furnished with high and low modules, countertop, sink, taps
single lever and appliances (ceramic hob, oven and hood
extractor).
• A/C machine fully installed for living room-kitchen and bedrooms.
• Pool.
Contact us today to arrange a viewing on 950 615 388.
Read more